Concrete pools for Perth, finished when we promise.
Counting from a call today, the published 8 to 16 weeks puts your finished pool between Thursday 24 December and Thursday 18 February 2027.
Family-owned in Darch, about 30 pools a year. If we promise to finish yours before Christmas, get your bathers ready.
Count it from the day you call.
Our timeline: a written quote about a week after the site visit, 4 to 6 weeks for plans, engineering and council approval, then 3 to 6 weeks to build. Pick a day and the calendar lays it out.
Written quote by Thursday 5 November. Plans and approval through between 3 December and 17 December. Finished between 24 December and 18 February 2027.
Christmas 2026 is inside the window if approvals and the build run to the short end. Ask George what he can promise.
Swipe for the later months.
- Site visit and written quote (about a week), then plans, engineering and council approval (4 to 6 weeks, longer if council is slow)
- Construction: 3 to 6 weeks
- Finish window: 8 to 16 weeks overall, counted here from the day you call
- Christmas Day
Dates are estimates from the timeline Malibu publishes. It does not say when the clock starts, so the calendar counts from the day you call. George confirms yours after he has seen the block.
About thirty pools a year, from Sorrento to East Fremantle.
For over 30 years we have built lap pools, plunge pools, freeform pools, spas, water features and fish ponds, all in concrete, for Perth homes.
A tiled feature wall and spa in East Fremantle, water dropping over stacked stone in Claremont, a Roman end in Stirling: each pool is captioned with the suburb in the business's own photo file name.
Eight to sixteen weeks, and the other answers.
Timing, quotes and shell-only pools, answered the way we answer them on the phone.
How long does it take to build a concrete pool with Malibu?
Generally 8 to 16 weeks overall. After the on-site inspection, a written quotation usually comes back within one week. Once you accept it, work starts straight away on the plans, engineered drawings and planning approvals, which take 4 to 6 weeks, or longer if council is slow to approve the plan. Construction itself takes 3 to 6 weeks.
How soon will I get a quote?
A written quotation is usually returned within one week of the on-site consultation.
Can I get a pool quote online or by email?
Not normally, unless you have first spoken with George on 0427 302 244. Detailed plans have to be sent for an accurate quotation, and a site inspection is always recommended to check site access, soil types and anything else that may affect the final price.
How long does a shell-only pool take?
Pre-approved pools that need shell-only construction (dig, form, steel and concrete) take 4 to 7 days.
Will my pool be finished on the date you give me?
We build about 30 pools a year. That building model lets us give each client more individual service and guarantees full completion within the time frame we specify. If we promise to finish your pool before Christmas, get your bathers ready.
What kinds of pools does Malibu Pools and Spas build?
Concrete swimming pools and spas for Perth homes. For over 30 years we have built lap pools, plunge pools, freeform pools, water features and fish ponds.
Where is Malibu Pools and Spas based?
At 24 Ardmore Terrace, Darch WA 6065. Our gallery includes pools in Hillarys, Sorrento, Landsdale, Darch, Beechboro, Inglewood, Mount Lawley, Coolbinia, Stirling, Claremont, Mosman Park and East Fremantle.
